I used some 2 inch wide boards from the barn as a level roof base, and it took the majority of a Saturday to nail them down. I was working in the HOT sun, and I knew my back was going to be bright red, but I had to secure at least one plastic panel before hanging up the tools for the day.
So there it is, The roof is finally starting to come together. Now, for some Aloe Vera, and nice long nap…